Can't wait to see a deck back here
Jake is always somewhere keeping watch!
![]() |
First the footers are dug. |
![]() |
Elevated rebar is laid in the hole. |
![]() |
Then the cement is poured. Voila! A base for the walls to stand on! |
![]() |
Power cable going into the trench. |
![]() |
Covering up the cable and regrading the road. |